A sketch on made-up data: it reads purchase orders, pulls out each line and checks the price.

A sketch on made-up data. Every order, customer, code and price in this note is invented. No real company data was used.
Prepared by
Jon Ross, VOCABOTICS LTD
Date
12 November 2026
Reference
VOC-PRF-OC-002
If this is useful to you

Would it be worth running this on 30 of your own purchase orders, redacted?

By whenNo deadline. A one-line reply to jon@vocabotics.com is plenty.

1What this shows

It reads a purchase order as it arrives, finds each line and checks it against that customer's contract price. It then drafts the acknowledgement, with any queries listed, for a person to check and send.

27/34

order lines right on 9 orders it had not seen

9/9

customer and PO number right

8/10

expected issues flagged, no false alarms

0/7

lines right on ward requisition forms

The orders came in four shapes: an NHS trust PO, a care group's own form, a plain email and a ward requisition form. For each one it finds the customer, PO number and delivery address. It pulls out every line, from the item code (allowing slips like "CB1001") or from the description. It checks each line against the contract price, and the order against its own rules, such as an NHS order with no PO number. It then drafts the acknowledgement for a person to approve.

Nine of the orders were written separately, from the price list and the check rules only. I scored them once, with the extractor frozen. Seven were fully right.

2Where it goes wrong

The honest reading

Both ward requisition forms failed completely. They set out their items as a plain-text table with the quantity at the end of the line, a layout my five build orders did not include. All 7 lines were missed, and so was one bed ordered without a mattress.

Every PO table and email came out right, including an item that is not on the price list. The failure was one layout nobody had thought of, which is how extractors usually break. I fixed it afterwards and the re-run read all 34 lines. Those orders were no longer unseen by then, so the figure to quote is 27 of 34.

3What made-up data cannot show

  • How your real documents look. Scans, photographed forms and the habits of each ward are not in a set I wrote myself.
  • Your real contract terms. Exceptions, rebates and unwritten rules are not in an invented price list.
  • How a person uses the flags. A check only helps if the team trusts it enough to act on it.

What a real version would take

Thirty to 50 of your recent orders, redacted, become the test set, and I score the reader on them before anyone relies on it. Your price list and terms are the source of truth. Clean orders go through as drafts and anything flagged waits for a colleague.

AEvidence

E1Nine held-out orders: 27 of 34 lines right, 7 of 9 orders fully rightMeasured

Source: results/accuracy_holdout.md and results/accuracy_dev.md, scored once, extractor frozen

Measure 5 orders it was built on 9 held-out orders
Customer account identified 5/5 9/9
PO number correct 5/5 9/9
Delivery address found, or rightly missing 5/5 9/9
Order lines right (item, quantity, price) 21/21 27/34
Expected issues flagged 8/8 8/10
Flags raised that were right 8/8 8/8
Orders fully right 5/5 7/9
E2The held-out orders one by oneMeasured

Source: results/accuracy_holdout.md

Order Shape Lines right Issue it should flag Fully right
H01 NHS PO table 4/4 none
H02 NHS PO table 4/4 price mismatch, line 3
H03 NHS PO table 4/4 line total, line 3; missing PO
H04 Care PO table 4/4 discontinued, line 1
H05 Care PO table 4/4 price mismatch, line 3; quantity check, line 4
H06 Email 3/3 none
H07 Email 4/4 missing delivery; unknown code, line 3
H08 Requisition form 0/3 bed without mattress
H09 Requisition form 0/4 line total, line 4
E3One held-out order end to end (H07, an email)Measured

Source: results/extraction_holdout.json, results/order_lines_holdout.csv

H07, made up, as received

Hello, we have a new resident arriving at the end of the month and need to get set up. Please can you send: 1 x bariatric low bed CB-1002 at £3,380; 1 x MT-2O03 alternating air mattress and pump at £1,180; 2 x pressure sensor floor mats; 1 x delivery and installation at £85. If the sensor mats are something you don't do, let me know and I'll source them elsewhere.

What it read. Four lines. CB-1002 at £3,380.00 and MT-2003 at £1,180.00 (read from the slip "MT-2O03") both match the contract price. Line 3, the floor mats, has no code and no match, so it is flagged as an unknown item. Line 4 is matched from its description at £85.00. At order level it flags a missing delivery address.

E4After the layout fix: 34 of 34 lines and 10 of 10 issues. Not held-outMeasured

Source: results/accuracy_holdout_after_fix_not_heldout.md. Run after the failures were seen, so not a fair test

E5A test on 30 to 50 of your own orders, scored the same wayProposed

Source: this note

E6Behaviour on real scans and photographed formsUnconfirmed

Source: not tested. Every document here was generated as a clean PDF

Next

  1. Reply with one line if a test on your own orders would be useful. No form, no commitment.
  2. Send 30 to 50 orders, redacted as you see fit. I score the reader on them and return a sheet in the same shape as above.
  3. Or start with a review. The Opportunity Review is £1,950 fixed over one week, remotely: a 60-minute call, a short questionnaire and up to three sample documents. You receive a written review of about eight pages. It is paid at booking and credited in full against a Discovery Sprint booked within 30 days.

Jon Ross

VOCABOTICS LTD

DATED AND HASHED · PROOF NOTE ·12 NOV202628f08286
SHA-256 28f08286

Questions about this note? Email hello@vocabotics.com. Jon replies personally, usually within two working days. All proof notes